Nov. 19 ~ 20 Asphalt road paving in front of the Dorm Wen, and Garbage can area (Rescheduled)
Name: Asphalt road paving in front of the Dorm Wen, and Garbage can area
Time: November 19, 2022 (Sat.) ~ November 20, 2022 (Sun.)
Construction manufacturer: Yuquan Engineering Co., Ltd. Mr. Lin: 0932-177170
Description:
1. The construction scope is shown in the picture below. Please bear with the noise and inconvenience caused by the operation of the equipment during the period.
2. During the construction period, non-related personnel or vehicles should not approach the surrounding areas of the construction. People and vehicles should pass according to the control. During the operation, part of the lane must be occupied to cause inconvenience. To Dorm Wen, please pass the road beside Dorm Hui. (The stairs between Dorm Jing and Hui are not open.)
3. In case of rain, construction will be postponed. Sorry for the inconvenience caused.
Division of Student Housing
